Outfitter stock & fittings

Country-work methods manual
Permanent field instruction: reduces the base Mining and Logging interval by 15%.
- Offer type
- Service or permanent improvement
- First-rank base price
- $250.00
- Purchase limit
- 1 total rank(s)
Additional requirements
| Requirement |
|---|
| Clear Silverglass Powder Yard 1 time(s) |
Availability
This offer is a workshop service or improvement, so it has no finite town shelf. Its requirements, purchase-rank limit, cash and material costs still apply.
Listed modifiers
Raw modifier units are retained; fractional stats and flat ratings use different scales. Read the description and live quote before comparing bonuses.
| Effect | Amount | Applies to |
|---|---|---|
| Interval | -0.15 | Mining |
| Interval | -0.15 | Logging |