A Line That HoldsThe player's field guideThe Meridian Reach
Player reference
Play the game →
Browse the field guide
Jobs & recipes

Prepare Warrant Clerk allotments

Create 25 base Allotments using the listed Chits and selected materials or currency. Preservation saves the entire ingredient cost, including cents or Warrant credit.

Trade
Teamwork
Required trade level
55
Base trade XP
27
Base work interval
5 s

Additional requirements

Requirement
1 discoveries for Warrant Clerk allotment

Base ingredients

Before preservation, discounts or a selected input option.

Additional ledger cost

CurrencyAmount
Warrant credit1,000

Base outputs

Before doubling, quality changes and other live modifiers.

Conditional ingredient reductions

The current recipe quote applies eligible reductions and the game’s limits. Some specialist recipes use a value-priced quantity, so selected goods and the current quote determine the actual basket.

IngredientsReductionRequirement
5%Prepare Warrant Clerk allotments mastery 10
5%Prepare Warrant Clerk allotments mastery 20
5%Prepare Warrant Clerk allotments mastery 30
5%Prepare Warrant Clerk allotments mastery 40
5%Prepare Warrant Clerk allotments mastery 50
5%Prepare Warrant Clerk allotments mastery 60
5%Prepare Warrant Clerk allotments mastery 70
5%Prepare Warrant Clerk allotments mastery 80
5%Prepare Warrant Clerk allotments mastery 90
5%Prepare Warrant Clerk allotments mastery 99
Red supply chit, Blue supply chit, Gold supply chit1 item(s)Prepare Warrant Clerk allotments mastery 50
Red supply chit, Blue supply chit, Gold supply chit1 item(s)Prepare Warrant Clerk allotments mastery 99
Red supply chit, Blue supply chit, Gold supply chit1 item(s)Teamwork mastery pool at least 95%

Mastery

Every 10 mastery levels through 90 reduces non-Chit costs by 5%; mastery 99 adds another 5%. Mastery 50 and 99 each remove one Chit of every colour; mastery 99 also adds 10 base Allotments.

Timing and yield

The table gives content-defined base values. Your tools, equipment, mastery, outcomes and other active modifiers determine the current quote. Failed or random work does not promise a successful output on every cycle.