A Line That HoldsThe player's field guideThe Meridian Reach
Player reference
Play the game →
Browse the field guide
Jobs & recipes

Commission packing crew work coat · master

An Ordnance counter order. Exchange the listed assayed material, supply tickets or equipment for 1 Packing crew work coat · master. 2s base work cycle; your listed bonuses apply. The counter supplies finished goods from its own stock; this is not a manufacturing recipe.

Trade
Ordnance
Required trade level
85
Base trade XP
160
Base work interval
2 s

Base ingredients

Before preservation, discounts or a selected input option.

Base outputs

Before doubling, quality changes and other live modifiers.

Conditional ingredient reductions

The current recipe quote applies eligible reductions and the game’s limits. Some specialist recipes use a value-priced quantity, so selected goods and the current quote determine the actual basket.

IngredientsReductionRequirement
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 10
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 20
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 30
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 40
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 50
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 60
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 70
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 80
Packing supply ticket, Workshop order ticket5%Commission packing crew work coat · master mastery 90
Packing supply ticket, Workshop order ticket15%Commission packing crew work coat · master mastery 99

Mastery

Ingredient costs fall by 5% every 10 mastery levels through 90, plus 15% at 99. Every ingredient retains a minimum cost of one.

Timing and yield

The table gives content-defined base values. Your tools, equipment, mastery, outcomes and other active modifiers determine the current quote. Failed or random work does not promise a successful output on every cycle.